Product Categories

Refrigerant Gas Monitoring Panels - Fixed Systems

Refrigerant Gas Monitoring - Portable Systems

Compressor Condensing Unit Control Panels

Condenser Control Panels

Evaporator - Room - Zone Control Panels

Air-Handler, Chiller, and Energy Management Control Panels

Sensors

Breathing Apparatus and Accessories

Alarm Indication Equipment

Remote Monitoring and Communications

OEM - Original Manufactured Equipment

 

 

EPC 2000 Multiplex Parallel Rack Control

  • An all electronic control system that can control the compressors, condenser and defrost of a multiplex refrigeration rack


Click for Specifications

EPC2000 Product Page

Defrost

The EPC-2000 is capable of operating up to thirty-two (32) defrost circuits, in increments of eight circuits per relay board. Each defrost relay board has eight control relays, a single slave gas solenoid relay, and eight digital inputs.

Gas Defrost Solenoid Relay--Each defrost relay board has a gas defrost solenoid on board. The relay is operated as a slave to the individual circuit relays. An eight position dip-switch assigns control of the gas solenoid to each individual circuit. When a gas defrost circuit activates, the gas solenoid relay also activates.

Defrost Schedule--Each defrost circuit can be scheduled for up to 12 cycles per day, for up to 120 minutes per cycle. The defrost circuit can be assigned as an Off-time, Gas or Electric defrost. The EPC-2000 will check the programmed schedule and will not permit more than one gas defrost to occur at a time.

Defrost Termination--Each defrost circuit has a pre-assigned digital input. This input is designed for a dry contact, close on termination Clicks-On Thermodisk input. The Clicks-On should be rated for the desirable termination temperature. When the digital input reads a close signal, the EPC-2000 will terminate the defrost cycle.

Temperature Alarm--The termination Clicks-On can cause a case temperature alarm to activate if the Clicks-On does not reset after 60 minutes.

Fail-Safe Control--Each Defrost Relay Board has a clock and memory. Once the EPC-2000 has been operating for over 24 hours, the defrost relay board is capable of operating independently from the EPC. The defrosts cycling will continue whether the EPC is operating or not.

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

Genesis International, Inc. reserves the right to change product specifications and availability without notice.

Contact a factory representative for additional information on this and any other products.

Copyright © Genesis International Inc. All Rights Reserved.